In various projects, equipment in the equipment room is indispensable, and the cabinet is one of the main equipment. What are the specifications for installing the equipment cabinet in the equipment room? The following editors will talk to you about the four points of the equipment room cabinet installation specifications.
(1) The mainframe, storage equipment, and server cabinets should be arranged in partitions.The mainframe, storage equipment, server cabinets, UPS, air conditioners and other equipment should be reserved for maintenance according to product requirements, and the maintenance intervals of adjacent equipment are allowed to overlap;
(2) The relative position of the equipment that enters the computer room in stages and the reserved expansion equipment should be rationalized in phases, which should not only comply with the technological process of the computer system, but also facilitate the future entry of expansion equipment and the connection of cables;
(3) When placing server cabinets with large heat generation such as IBM690, 670 and other server cabinets, the net distance between the front of the cabinets should not be less than 2.1 meters, so as to avoid too high heat density and affect the heat dissipation of the equipment;
(4) The server room with more equipment is recommended to be a column head cabinet, so that the integrated wiring cables are collected into the column head cabinet, rather than the core cabinet, thereby saving twisted pairs and optical fibers.